Home Business New Minister Pledges to Fix Nigeria Power Sector & Grid
Business

New Minister Pledges to Fix Nigeria Power Sector & Grid

Share
Share



The new Minister of Power, Olasunkanmi Tegbe, on Wednesday, assured Nigerians that the era of repeated national grid collapses, erratic electricity supply, and persistent vandalism of power infrastructure would soon be brought under control, pledging urgent reforms to stabilise the country’s troubled power sector.

Tegbe gave the assurance during his screening during the Senate plenary in Abuja, where he was later confirmed as Minister of Power following questioning from lawmakers over the state of the electricity sector.

The confirmation followed a rigorous screening session presided over by Senate President, Godswill Akpabio, during which lawmakers pressed the nominee for firm timelines, transparency and a clear reform roadmap to stabilise electricity supply and restore investor confidence.

The Senate also handed him what lawmakers described as a mandate to deliver rapid and measurable improvements in a sector long crippled by grid collapses, weak transmission infrastructure and a deepening liquidity crisis estimated in trillions of naira.

In a rare show of bipartisan concern, senators warned that Nigerians had grown tired of promises, insisting that Tegbe must demonstrate visible results within months or risk losing public trust.

Leading the charge, Senator Mohammed Tahir Monguno (Borno North) described the appointment as timely but stressed that the scale of the sector’s dysfunction required decisive and urgent intervention.

He decried the recurring collapse of the national grid, calling it a major setback to Nigeria’s industrial ambitions, and blamed transmission bottlenecks for the inability to evacuate generated power effectively.

“Grid collapse has become a recurring decimal, undermining development. Transmission has failed to match generation capacity,” he said, adding that insecurity in parts of the North-east had worsened infrastructure damage.

Responding, Tegbe acknowledged that the challenges facing the sector were systemic rather than isolated, citing weak coordination, poor enforcement of technical standards and inadequate gas supply as major causes of instability.

“Grid collapse is not accidental; it reflects deeper structural problems,” he said.

He pledged a 100-day reform window aimed at stabilising the grid and introducing a public performance dashboard to allow Nigerians to track progress and hold the ministry accountable.

“If there are no results in three months, there will be none in six. Nigerians should hold us accountable,” he declared.

Tegbe also raised concerns about entrenched interests benefiting from inefficiencies in the sector, vowing to confront sabotage head-on.

“There are elements that do not want the system to work because they benefit from its failure. We will take them on,” he said.

On vandalism of power infrastructure, the minister-designate described the trend as a national security threat and pledged closer collaboration with security agencies, including the Office of the National Security Adviser and the military, to protect critical assets.

He also acknowledged the sector’s worsening liquidity crisis, put at about N6 trillion, which lawmakers said had stifled investment and weakened the entire electricity value chain.

In response, Tegbe admitted that the current financial model was unsustainable and promised reforms, including market-reflective tariffs, while balancing affordability for vulnerable Nigerians.

“Electricity pricing must reflect market realities, but affordability remains essential. We will ensure a fair balance,” he said.

Lawmakers, including Senator Tokunbo Abiru (Lagos East), demanded clear timelines for achieving a stable electricity supply, stressing that reliable power remained critical to economic growth and job creation.

Senator Orji Uzor Kalu (Abia North) criticised the fragmentation of the power sector into generation, transmission and distribution companies, arguing that the lack of synergy had worsened inefficiency.

Tegbe assured the Senate that his reform plan would prioritise stronger coordination across the electricity value chain, improved gas supply to generation companies, and accelerated nationwide metering to reduce estimated billing and improve revenue collection.

On rural electrification, he said the government would expand mini-grid and renewable energy solutions, particularly solar, to reach underserved communities.

“Decentralised energy will be key to reaching underserved communities and ensuring inclusive access,” he said.

Deputy Senate President Barau Jibrin underscored the urgency of reform, describing the power sector as Nigeria’s biggest obstacle to economic competitiveness.

“Our industries cannot thrive without reliable electricity. What we need now are results, not assurances,” he said.

Despite the tough scrutiny, lawmakers expressed cautious confidence in Tegbe’s capacity, citing his professional background and the clarity of his reform proposals.

In his closing remarks, the new minister reiterated his commitment to measurable progress, acknowledging the enormity of the task but insisting that disciplined implementation would deliver results.

“This is a difficult assignment, but progress is achievable with transparency, discipline and collaboration. Nigerians will see change,” he said.

The Senate’s unanimous confirmation now sets the stage for what lawmakers described as a critical test of the administration’s resolve to finally break the cycle of grid collapses and stabilise Nigeria’s electricity supply.



Source link

Share

Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Articles

Hantavirus Outbreak on Cruise Ship Triggers COVID Measures

Passengers aboard the MV Hondius have adopted strict health protocols reminiscent of...

Nigeria leverages $20bn deepwater project to attract global OEMs

From Adewale Sanyaolu, Houston, Texas Nigeria is leveraging a multi-billion-dollar deepwater oil...

AGHAN suspends planned strike after NCAA’s intervention

‎By Chinelo Obogo Aviation Ground Handlers Association of Nigeria (AGHAN) have suspended...

NAPTIP busts child trafficking ring, rescues two in Enugu

The National Agency for the Prohibition of Trafficking in Persons has uncovered...

news-1701

sabung ayam online

yakinjp

yakinjp

rtp yakinjp

slot thailand

yakinjp

yakinjp

yakin jp

yakinjp id

maujp

maujp

maujp

maujp

slot mahjong

SGP Pools

slot mahjong

sabung ayam online

slot mahjong

SLOT THAILAND

article 328000631

article 328000632

article 328000633

article 328000634

article 328000635

article 328000636

article 328000637

article 328000638

article 328000639

article 328000640

article 328000641

article 328000642

article 328000643

article 328000644

article 328000645

article 328000646

article 328000647

article 328000648

article 328000649

article 328000650

article 328000651

article 328000652

article 328000653

article 328000654

article 328000655

article 328000656

article 328000657

article 328000658

article 328000659

article 328000660

article 888000061

article 888000062

article 888000063

article 888000064

article 888000065

article 888000066

article 888000067

article 888000068

article 888000069

article 888000070

article 888000071

article 888000072

article 888000073

article 888000074

article 888000075

article 888000076

article 888000077

article 888000078

article 888000079

article 888000080

article 888000081

article 888000082

article 888000083

article 888000084

article 888000085

article 888000086

article 888000087

article 888000088

article 888000089

article 888000090

article 868100051

article 868100052

article 868100053

article 868100054

article 868100055

article 868100056

article 868100057

article 868100058

article 868100059

article 868100060

article 868100061

article 868100062

article 868100063

article 868100064

article 868100065

article 868100066

article 868100067

article 868100068

article 868100069

article 868100070

article 868100071

article 868100072

article 868100073

article 868100074

article 868100075

article 868100076

article 868100077

article 868100078

article 868100079

article 868100080

cuaca 898100041

cuaca 898100042

cuaca 898100043

cuaca 898100044

cuaca 898100045

cuaca 898100046

cuaca 898100047

cuaca 898100048

cuaca 898100049

cuaca 898100050

cuaca 898100051

cuaca 898100052

cuaca 898100053

cuaca 898100054

cuaca 898100055

cuaca 898100056

cuaca 898100057

cuaca 898100058

cuaca 898100059

cuaca 898100060

cuaca 898100061

cuaca 898100062

cuaca 898100063

cuaca 898100064

cuaca 898100065

cuaca 898100066

cuaca 898100067

cuaca 898100068

cuaca 898100069

cuaca 898100070

cuaca 898100071

cuaca 898100072

cuaca 898100073

cuaca 898100074

cuaca 898100075

cuaca 898100076

cuaca 898100077

cuaca 898100078

cuaca 898100079

cuaca 898100080

cuaca 898100081

cuaca 898100082

cuaca 898100083

cuaca 898100084

cuaca 898100085

cuaca 898100086

cuaca 898100087

cuaca 898100088

cuaca 898100089

cuaca 898100090

cuaca 898100091

cuaca 898100092

cuaca 898100093

cuaca 898100094

cuaca 898100095

cuaca 898100096

cuaca 898100097

cuaca 898100098

cuaca 898100099

cuaca 898100100

cuaca 898100101

cuaca 898100102

cuaca 898100103

cuaca 898100104

cuaca 898100105

cuaca 898100106

cuaca 898100107

cuaca 898100108

cuaca 898100109

cuaca 898100110

cuaca 898100111

cuaca 898100112

cuaca 898100113

cuaca 898100114

cuaca 898100115

cuaca 898100116

cuaca 898100117

cuaca 898100118

cuaca 898100119

cuaca 898100120

cuaca 898100121

cuaca 898100122

cuaca 898100123

cuaca 898100124

cuaca 898100125

cuaca 898100126

cuaca 898100127

cuaca 898100128

cuaca 898100129

cuaca 898100130

cuaca 898100131

cuaca 898100132

cuaca 898100133

cuaca 898100134

cuaca 898100135

article 710000051

article 710000052

article 710000053

article 710000054

article 710000055

article 710000056

article 710000057

article 710000058

article 710000059

article 710000060

article 710000061

article 710000062

article 710000063

article 710000064

article 710000065

article 710000066

article 710000067

article 710000068

article 710000069

article 710000070

article 710000071

article 710000072

article 710000073

article 710000074

article 710000075

article 710000076

article 710000077

article 710000078

article 710000079

article 710000080

article 999990011

article 999990012

article 999990013

article 999990014

article 999990015

article 999990016

article 999990017

article 999990018

article 999990019

article 999990020

article 999990021

article 999990022

article 999990023

article 999990024

article 999990025

article 999990026

article 999990027

article 999990028

article 999990029

article 999990030

article 999990031

article 999990032

article 999990033

article 999990034

article 999990035

article 999990036

article 999990037

article 999990038

article 999990039

article 999990040

news-1701